 Waitrose Building Standards
Website.
 Searching the website
to locate a specification.
 The website showing the
specification of a 'double sided island gondola'.
 The same gondola as installed
in a new store.

Working through the site, users are able to locate all the
specification information they need.

In the Projects & Properties part of the ICON System
Waitrose stores videos taken at each store.
|
Waitrose
case study
The ICON System has been implemented into the
Waitrose Feasibility Department to assist with the communication
and sharing of building design specifications and information.
The system allows Waitrose to hold various types
of data at different levels, all of which can be easily located
through simple navigation or by a search facility. The control of
information is managed online so that data can be updated in real-time.
This ensures that users can be confident in having access to correct
and accurate information at all times.
Information can be accessed by any registered
user. The information each individual has access to is determined
by a permission-based user management tool. ICON is dedicated to
providing the secure web-based environment that has allowed
Waitrose to expand the scope of the system to external competing
suppliers.
The system runs on a standard web browser with
no requirement for browser plug-ins. It is hosted at a data centre
connected to the Internet directly on diversely routed fibre connections
with bandwidth up to 4.5GB/s supported by UPS and generator back
up power and multiple redundant air conditioning systems.
In addition to being an interactive repository
for specification information, the system holds basic level information
for each of the Waitrose Stores, along with a Document Management
System, where drawings and documentation are held and linked into
the Design Standards Area.
From Legacy Methods to Web-Based Systems
Prior to using the ICON system, Waitrose used
a PDF based hyperlinked document repository. Although the information
held within it was well structured, navigating through it was difficult.
The biggest restriction was keeping the data up-to-date.
The new web-based solution enables Waitrose
to navigate around information much more easily than the old system;
more importantly the information can be updated almost immediately.
This ensures that users know that they are reading the current specification.
Waitrose are also able to manage and track document
changes with much more visibility. With each piece of information
being date stamped and revision history being available, Waitrose
again know that what they are viewing is current and correct.
Supported by a secure user access system, Waitrose
can trust that different roles, both within Waitrose and suppliers,
will only see the areas that have been predetermined by the permission-based
system.
Waitrose works in a fast moving environment
and therefore, one of the keys to the success of the system is communication.
Changing specifications without informing users is ineffective.
The ICON system has addressed this issue by regularly informing
users of any changes that have been made through notification emails.
Benefits Realised
The ICON System provides a number of benefits
to users at Waitrose; primarily enabling simple and effective communication
and sharing of design specifications and information.
The Design Standards area of the system provides
absolute clarity that users have all the necessary information at
hand with which to design and build Waitrose branches.
Document Management allows Waitrose to be assured
that drawings which are used in several areas are not duplicated
and therefore know that when one is changed, all are updated. The
system also allows information to be shared in a Document Exchange,
enabling all users with access rights to share information in files
of any size, which can be retrieved at any computer.
The service provided by ICON includes administering
user system requests, a helpdesk function and managing updates through
a change process. This gives Waitrose certainty that users are notified
and can track changes that affect projects, both before and during
a build.
Solution Success
The ICON System has made Waitrose's Design Standards
information highly visible. Part of the data migration process highlighted
to Waitrose many areas where information was both missing and incorrect.
The system also focused Waitrose on using a single source for specification
information, ensuring that one correct message is always being sent.
As part of this increase in awareness, Waitrose
has been able to review much of the specification data and make
specific changes to elements of its build programme, saving both
time and money. An example of this is when the system enabled the
review of the doors and ironmongery used in a new build specification,
resulting in a 33% reduction in the complexity of the door schedule.
In addition to saving time and money prior to
a build project beginning, the system has assisted with the reduction
of on-site mistakes. The ‘get it right first time’ philosophy implemented
by ICON assists in saving time, money and frustration, which in
turn has helped to see a reduction in wastage.
Success elsewhere has also been apparent; the
improved navigation and visibility of information has resulted in
a reduction in query calls and emails, freeing up time to focus
on other tasks.
In addition to this time saving, Waitrose's
Design Standards team has seen clear reductions in the amount of
time needed managing the specifications which are updated by ICON
part of the service provided to Waitrose.
|